Something to See at Every Phase
You don't wait until the end to see anything. Every phase closes with something you can open and click: design files, a staging site, performance numbers.

These three run through all six stages below.
You don't wait until the end to see anything. Every phase closes with something you can open and click: design files, a staging site, performance numbers.
You can stop when a phase ends. Design files, source code and documentation are handed over, so another vendor can pick it up without getting stuck.
A progress demo every two weeks, scheduled in advance. You never have to wait for us to report in, or guess where the project stands.
These ranges come from what past projects actually took, not from the best case. The scope document sets the binding dates.
We work out what problem you're solving, what assets you already have, and what's realistic within your budget and timeline.
Everything we discussed goes into writing. Each deliverable is stated as a criterion you can check on the spot, so neither side has to rely on a feeling about what "done" means. This document becomes the basis for acceptance.
Information architecture is settled before any visual work starts. Development begins only after the designs are approved — changes here cost far less than changes during build.
A working staging build lands every two weeks. On 3D projects we optimize the models and run performance tests first, confirming it runs well before stacking features on top.
We check the scope document item by item. Functional adjustments, interface refinements and bug fixes during the QC period carry no extra charge.
We deploy to your domain, hand over accounts and documentation, and run a training session.
None of these are impossible to change; they simply cost far more to change than anything else, which is why we confirm them explicitly at the relevant phase.
How fast assets arrive. We've had whole projects pushed back by late 3D models, scanning schedules, and domain registration on the client side.
That's why phase 02 puts what you need to supply, and by when, into the document — so both sides have something to point to.

If you want a sense of cost first, start with the price ranges. If your scope is already clear, a conversation gets there faster.