(Case study) Urban renewal・Polish 3D
A home chosen in 3D, before it’s built.
Winsing Construction runs its unit selection on . Before construction begins, each owner can walk through the new home, check the sunlight, views and balance estimate, then register choices; selection conflicts, signing invitations and contact with every owner are all handled in one back office.
Partner developerWinsing Construction

(Challenge)
Every unit must choose a new home within the deadline.
Under rights transformation, owners apply for their allocated positions, and the implementer must collect every choice within the acceptance period. This project has two towers, more than 200 units and more than 200 parking spaces.
Owners want to know first how many hours of sun a unit gets in winter, how open the view is, and how much they would pay or receive. Implementers want to know first which conflicts to settle, which owners have not logged in, and which have not signed the consent form. All of these questions are answered inside one 3D building and one set of selection rules.
(Approach)
Owner and case officer look at the same 3D building.
Owner side: tap a floor to unfold it, tap a unit to focus, then walk into the interior and stand at the window. Every unit has a large-type one-page brief and a full four-page report; drag to arrange three choices, and the range meter shows at once whether they are within range, with the balance payment estimated alongside. Afterwards, download the selection certificate. Co-owners can team up and share one set of choices.
Case officer side: the war room lists conflicts on the same 3D building; open one conflict card and the 3D marks only that case. Invitation links go to every owner by LINE, and the activity log and announcement read list help the case officer set the order of contact.
(Key design)
Three key designs
Walk in first, then decide.
Exterior, floor unfolding, interior overview and walkthrough, a 360-degree view at the window: every unit is different. Winter sunlight, summer western sun, cross-ventilation, openness of the view and greenery outside are worked out unit by unit from public weather and building data. The one-page brief has eight key points in large, plain language that older owners read easily; the four-page report compares the mirrored unit on the same floor and the same unit type on other floors. While ranking, the range meter shows the range and the balance payment is estimated live; the official amount follows the approved rights transformation plan.
When choices collide, owners get a reference letter.
When two or more owners choose the same unit, the system calculates a mediation plan with a branch-and-bound algorithm: when enough options remain, no draw is needed; when not, the number of people drawing is minimal, regardless of registration order or rights value. The case officer opens this owner’s reference letter and a short letter is produced at once, as two A4 pages and a phone version. Switching and staying sit side by side at equal length and the owner decides; winter sunlight, summer western sun, window view, greenery and cross-ventilation are compared item by item, with the balance payment listed as “now” and “if switched.” When the gap between two units is large, the system reminds the case officer to explain in person or by phone instead.
Not yet signed, the new home is already in view.
Owners who have not yet signed the consent form can view 3D, choose a home and estimate the balance payment; signing is required before saving choices, and the save button states “Sign the consent form to save choices.” After three minutes of each trial, an invitation card signed by the implementer appears, with a photo of the community and phone numbers of the building contact and the implementer that can be called directly; from the third time on, it shows at login. The case officer sees each unit’s trial count and invitation time in the back office, and the mark clears automatically after signing.
Bring the floor plans and selection rules, and start with a first meeting.
(Process)
From floor plan to every owner’s hands.
Floor plans grow into 3D on their own.
The floor plans are first converted to DXF, then a geometry program extracts unit outlines, unit codes, parking spaces, windows, balconies and interior layouts, assembles the 3D massing and checks it item by item. When the drawings are updated, one command rebuilds all data and reports in about 7 minutes; identifiers carry over from the previous version, and registered choices and prices need no moving.
A complete system in seven weeks.
Week 1, first version: floor plan extraction, 3D massing and a data panel. Week 2: choice registration, the member center and back-office management. Week 3, the war room; week 5, interior walkthrough and surrounding terrain; week 6, year-round sunlight and wind; week 7, conflict mediation suggestions, weekly backups and site monitoring. Developed throughout with AI collaboration: of 543 commits, 523 are co-signed by AI, about 96%.
Every selection rule, written as code.
Single-unit, multi-unit, land-only owners, large single units, shops, vacant land, joint selection, caps and over-limit confirmation: every rule is re-verified step by step on the server. Rules, code and tests are matched one by one, with more than 30 test files and more than 300 tests.
(Result)
Every owner, in the case officer’s view.
Reaching every owner: one-time invitation links that go out by LINE; a login page in large type, passwords in three groups and no redirects; seven tutorial videos watched inside the platform. Announcements show who has read and who has not, and a pinned unread one pops up on entry. The activity log lists each owner’s last login, days active, time spent, units viewed and which of eight features were used, and can filter “never logged in” and “logged in today.” The interest summary lists the units viewed longest and most often, the preferred unit types and floors, and whether they match the registered choices.
How the case officer uses it: owners who never logged in get a phone call; those who looked for a long time but did not save, the interest summary shows what they care about; those who have not read an announcement get another reminder. Owners see project progress and the selection certificate in the member center. Choices have receipts, the operation log can only be appended to, and encrypted backups run weekly with restore drills.
(Field notes)
Methods and measurements, open each one
Urban renewal unit selection from notice to settlement: what the system does at every step
In the six steps, people decide and the system takes over viewing, estimating, coordinating and record keepingWhen a position is contested, the system first prepares a coordination plan, and a public lottery follows only if neededUrban renewal unit selection: walk into the unit first, with sunlight, views and balance payment on screen
Public weather and building data become figures that are easy to read for each unitLandowners finish viewing, ranking and saving in three steps on screenHandling Position Conflicts in Urban Renewal: War Room, Coordination Suggestion and Selection Reference
The suggestion takes one of two paths depending on whether there are enough placesFrom staff opening the reference to the owner deciding(FAQ)
FAQ
How do owners enter the system?
The implementer issues a one-time invitation link that goes out by LINE. The login page uses large type, passwords come in three groups and there are no redirects; seven tutorial videos play inside the platform, and the building contact or the case officer can be reached whenever help is needed.
How are conflicts settled when several owners choose the same unit?
The war room lists conflict cards and the system works out the mediation plan first: when enough options remain, no draw is needed; only when not does the smallest number of people draw, regardless of registration order or rights value. Draws are held publicly under the selection rules.
What the choice reference letter contains
The case officer opens it and it is produced at once, as two A4 pages and a phone version. Switching and staying sit side by side at equal length and the owner decides; winter solstice sunlight, summer western sun, window view, greenery and cross-ventilation are always compared, with the balance payment listed as now and if switched. It can be produced for any two units.
What owners who have not signed the consent form can use
3D, choosing a unit and the balance estimate are all available; saving choices requires signing first. After three minutes of each trial, an invitation card signed by the implementer appears with phone numbers that can be called directly; the mark clears automatically after signing.
How does the case officer know which owners have not acted?
The activity log lists last login, days active, time spent, units viewed and features used, and can filter owners who never logged in and those who logged in today; announcements show who has read and who has not, and the interest summary shows the units viewed longest and most often.
Where the sunlight and balance figures come from
Sunlight is calculated from public weather and building data; winter sunlight hours, summer western sun and the openness of the view are worked out for every unit in advance. The balance payment is estimated live, and the official amount follows the approved rights transformation plan.
What happens when drawings are updated
One command rebuilds all data and reports in about 7 minutes; identifiers carry over from the previous version, and registered choices and prices need no moving.
The first meeting takes 15 to 30 minutes and gives a direction, a budget range and a draft timeline.
Polish 3DUrbird | Urban renewal, from plan to handover · View product pageNext case: Configurations outgrew the catalog, so customers finish the build before visiting a store
(Contact)
Start a project.
Three steps to a clear direction and budget range.
- 01Book the first meeting: choose a time. A full specification is not required.
- 02A 15 to 30 minute online consultation: direction, budget range, and draft timeline.
- 03After materials are reviewed, a quote and delivery specification follows in about 3 to 5 working days.
- hello@polish-design.com.tw
- Mailing address
- 3F, No. 191-1, Zhifu Rd., Zhongshan Dist., Taipei 104, Taiwan
Book the first meeting
Monday to Friday, 16:00–18:0030 minutes online
Choose a time, then confirm with a Google account or an email address. A confirmed booking can be added to the calendar.
Choose a time