Urban renewal unit selection from notice to settlement: what the system does at every step

Urban renewal unit selection has six steps. People decide; the system simplifies each one with invitations, 3D viewing, balance estimates, conflict coordination and downloadable certificates.

Polish Design engineering team・2026-11-14

Contents

Under rights transformation, selection is the step in which a landowner applies to the implementer for a position in the renewed building before the plan is approved. Article 43 of the Urban Renewal Act makes rights transformation the default for reconstruction zones, so every rights transformation project includes position applications. This article follows Article 17 of the Regulations Governing Rights Transformation from notice to settlement and describes who does what at each step and where Urbird|Urban renewal, from plan to handover helps.

The six steps set by law

Article 17 of the Regulations Governing Rights Transformation fixes a few actions for position applications. Article 3(1)(14) requires the plan to state how applications and lotteries are handled, and Article 5 requires the implementer to survey owners on preferred positions. Put together, selection runs in six steps.

  1. The implementer sets an application window of at least 30 days and notifies the rights holders.
  2. Each landowner applies for a position under the selection principles in the plan.
  3. When two or more owners apply for the same position, a public lottery decides.
  4. Owners who miss the window are assigned by public lottery.
  5. The assignment results are written into the rights transformation plan.
  6. After the plan is approved and announced, an owner with an objection follows the Article 53 procedure.
Fig. 1In the six steps, people decide and the system takes over viewing, estimating, coordinating and record keeping
Notice
Application
Conflicts
Lottery
Into the plan
Objection
Implementer
Landowner
System
1
ImplementerSet the windowAt least 30 days
2
SystemInvitation link, videos, notices
3
LandownerExplore in 3D, rank three choices
4
SystemBalance estimate and rule cards
5
SystemWar room and coordination plan
6
ImplementerRun the public lottery
7
ImplementerWrite into the plan
8
SystemSelection certificate download
9
LandownerFile a written objectionWithin two months of approval

Based on Article 17 of the Regulations and Article 53 of the Act. Objections in step 6 are received and reviewed by the competent authority.

Notice and invitation: the link goes out and sign-in just works

The window set in step 1 drives the schedule for everything after it. The system turns the schedule into rounds with clear start, close and lock times, and the member center shows a seven-stage progress line from the business plan to handover, so every owner can see where things stand.

Notice begins with a single-use invitation link that can be sent over LINE. The sign-in page is built for older owners: large type, the password shown in three groups, and no redirects after sign-in. Inside, 7 short tutorial videos play on the platform without leaving the site. When the implementer posts a notice, the platform shows who has read it and who has not, and a pinned notice pops up as soon as an unread owner signs in.

A community briefing where an older resident raises a hand to ask a question.
A community briefing where an older resident raises a hand to ask a question.

During the window: walk into the unit first, then rank choices

In the 3D model an owner finds the unit, looks at the exterior and the exploded floors, switches to three indoor viewpoints, and turns 360 degrees at the window. Winter sun to the hour and minute, summer afternoon exposure, cross-ventilation, how far the view opens and how much greenery sits outside all come with numbers. Sunlight is calculated from public weather data and building data.

Each unit has a one-page summary with 8 cells, up to 3 benefits and the things worth knowing first, in large plain type that older readers follow easily. For detail there is a 4-page report that includes the mirrored unit on the same floor and a comparison across floors of the same layout. The reports are computed in advance, so each one opens instantly.

Choices are ranked by dragging. After three choices are set, the range gauge shows whether the total is within the selectable range, and the balance payment is calculated at the same time, with the amount to pay or to be refunded listed directly. The estimate is live; the final amount follows the approved rights transformation plan. Co-owners can form a team and share one set of choices.

The selection rules live in the system and appear as rule cards: the first unit goes to the largest size, the first two choices are capped, and a total above the rights value needs confirmation to pay the difference in cash. Single units, multiple units, land rights holders, large single units, storefronts, vacant lots and joint selection are all re-verified step by step on the server, and about 30 rule rows are covered by more than 30 test files and over 300 tests. A selection that breaks a rule shows the reason at registration, so staff do not need to send it back.

Conflicts: the war room sorts out what to discuss first

During a round, the war room shows every unit's choices on one 3D building, with conflict cards and color marks, a table view with color blocks, and an over-selection tab. Staff open it and know which matter to take up first.

Fig. 2When a position is contested, the system first prepares a coordination plan, and a public lottery follows only if needed
  1. Owners register choicesThree choices each
  2. System compares all choicesFinds repeated applications for one position
  • Enough places
    Everyone gets a positionNo lottery needed
  • Not enough places
    Fewest people in the lotteryOthers placed by choice order
  • Two or more still apply, or an owner misses the window
    Public lotteryHeld under the selection principles

The coordination plan is advisory for staff. The legal triggers for a public lottery are in Article 17 of the Regulations.

An algorithm prepares the coordination plan. When there are enough places, it arranges everyone so that nobody needs a lottery; when there are not, it keeps the number of people in the lottery as small as possible. It does not consider registration order or rights value, and staff review it before deciding whether to use it.

For a contested position, staff can open a selection reference for that owner and produce it instantly: a short letter of two A4 pages, with a phone version. Switching and staying are shown side by side at the same size, and the owner decides. It compares winter sunlight, summer afternoon exposure, window view, greenery and cross-ventilation, and the balance appears in two columns, "now" and "if switched". The lottery consequence is spelled out: an owner who loses can only choose again from the units left over. A reference can be produced for any two units.

Staff also get a "can say, better not say" cue sheet that is never printed on the documents given to owners. When the gap between two units is large, the system reminds staff to talk face to face or by phone first.

A multi-story building model pulled apart layer by layer to show each floor plan.

Owners who have not signed the consent form: experience first, decide after

An owner who has not yet signed the consent form can still view the 3D model, pick units and work out the balance. Once the owner sees the position and the balance, the save button reads "Save choices after signing the consent form". After about 3 minutes of exploring, a warm reminder card appears with an illustrative picture, a short letter signed by the implementer, and phone numbers of the building representative and the implementer that can be called directly. From the third sign-in on, the card appears at sign-in.

The owner sees only an invitation and a reminder, with no label of any kind. Staff can see in the back office how many times each unit explored and when the reminder appeared, and the mark clears automatically after signing.

Staff use activity records to find who to contact

For each owner the back office records last sign-in, days active, time spent, the units viewed and which of the 8 features were used, and staff can filter for owners who never signed in or who signed in today. The member page adds an interest summary: the units viewed longest and most often, the preferred layout and floor, and whether these match the registered choices.

  • An owner who never signed in gets a phone call.
  • An owner who browsed for a long time without saving is approached with the interest summary showing what matters to that owner.
  • An owner who has not read a notice gets another reminder.
StepWhat the system doesWho uses it
1 NoticeInvitation link, tutorial videos, read tracking, seven-stage progressImplementer, owner
2 Application3D viewing, sun, wind and view figures, live balance estimate, rule cardsOwner
3 ConflictsWar room, coordination plan, selection referenceStaff, implementer
4 Consent not yet signedExploration with a warm reminder, visit countsOwner, staff
5 Lottery and settlementRound lock, settlement, certificate downloadImplementer, owner
6 Plan and objectionChoice receipts, audit logImplementer, legal staff

Lottery, settlement and certificate download

When the window closes, the system locks the round and the public lottery runs under the selection principles, with the implementer recording the results. Owners who missed the window go through the same lottery. After settlement, each owner downloads a selection certificate as a PDF from the member center, and every choice has a receipt. The audit log is append-only, and weekly encrypted backups come with a restore drill. When floor plans are updated during review, one command rebuilds all related data and reports in about 7 minutes, and choices and prices stay in place.

An older resident receiving the keys to a new home.
An older resident receiving the keys to a new home.

After approval

Once the competent authority approves and announces the plan, Article 53 of the Urban Renewal Act gives landowners two months to file a written objection stating the reasons. The authority rules within three months of accepting it, extendable by three in special cases. The authority handles this procedure, and owners and implementers can compare the selection certificate and the audit log with what was registered and assigned.

After settlement: the same list carries on through five more stages

After settlement, the same owner list, announcements, usage log and audit log carry on through five more stages. All five are added per project; existing features extend forward without being rebuilt.

  1. Business plan (added per project): the member center's seven-stage progress bar starts here, so owners can see where the plan stands.
  2. Filing (added per project): the assignment results, selection certificates and the append-only audit log stay in place, so what was registered can be compared before and after filing.
  3. Demolition notice (added per project): the notice goes out as a pinned announcement that pops up on entry for unread owners, and units that have not read it join the call list.
  4. Construction (added per project): progress photos and videos are published in stages, and the construction stage lights up in the progress bar.
  5. Handover (added per project): handover and inspection instructions go out as announcements, notices follow the assignment results unit by unit, and units that never signed in are confirmed by phone.

The full feature set is on the urban renewal system page, and the urban renewal system case shows how it runs in practice. To check details for a specific project, discuss the requirements with the development team.

(Contact)

Start a project.

Three steps to a clear direction and budget range.

  1. 01Book the first meeting: choose a time. A full specification is not required.
  2. 02A 15 to 30 minute online consultation: direction, budget range, and draft timeline.
  3. 03After materials are reviewed, a quote and delivery specification follows in about 3 to 5 working days.
Email
hello@polish-design.com.tw
Mailing address
3F, No. 191-1, Zhifu Rd., Zhongshan Dist., Taipei 104, Taiwan

Book the first meeting

Monday to Friday, 16:00–18:0030 minutes online

Choose a time, then confirm with a Google account or an email address. A confirmed booking can be added to the calendar.

Choose a time

Or send the details first

Not ready to pick a time yet: leave the project details here and the team replies by email. A meeting can still be booked right after sending.

More details (optional): service, stage, links, source

Information is used only to evaluate this project.

ISO/IEC 27001:2022 certificate

(Certificate)

ISO/IEC 27001:2022

Certification body
ARES International Certification
Scope
The development process for interactive immersive 3D systems, and network and infrastructure operations and management.

Verify with ARES

Urbird

Urban renewal you can see.

Before construction begins, landowners can walk through their new homes. From consent forms to demolition notices, everything runs in one system.

More than 100 modules, AI features included, combined to each developer’s needs.